Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Said1
  • Content: Threads
  • Order by date
  1. Said1

    Timing relay in Simulink

    I am trying to model a plant control system i.e governor, AVR and PSS. The PSS should be disabled under some conditions like P<10 % for 10 sec. I appreciate it if anybody help me develop such timing block in simulink?
  2. Said1

    DC Breaker Sizing

    1. Standards for calculating Short circiut currents According to IEC standards, The fault current on a dc system is given by a rising and decaying exponentials, described as: I(t)=Ip[1-exp(-t/tr)]/[1-exp(-tp/tr)] for t<=tp I(t)=Ip[? +(1-?)exp(-(t-tp)/td for t>=tp Where...
  3. Said1

    I2t Calc on semi-conductor fuses

    Vendors for Semiconductor fuses normally may supply let-through charts as well as melting and clearing I2t figures. When used for dc application where the short circiut waveform is known to have the following equation I(t)=Isc(1-exp(-at)), what method will be more accurate: Method 1: Use the...

Part and Inventory Search