Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Vporrazzo
  • Content: Threads
  • Order by date
  1. Vporrazzo

    Caltrans Type II Bored Pile and Connection to Column

    We are construction foundations consisting of 2,400mm diameter bored piles, 14,000mm deep. Bored pile terminates at ground surface. Subsurface materials are a thin layer of silty sand followed by mostly weathered tuff for the length of the pile so will use bentonite or Supermud for drilling...
  2. Vporrazzo

    Caving of Bored Pile Construction

    This is about a problem we are having for a 1.5m bored pile construction The following is the situation: 1. Boring data shows loose silty fine sand from surface to depth -5m, underlain by soft to medium stiff silty clay (N value=2 to 6) to -25m depth after which depth the clay becomes stiffer...

Part and Inventory Search