I was asked to look into a grounding issue inside a substation because of circulating ground currents.
The incoming service is 13.8kV 3 phase, 3 wire. There are 4 step down delta-wye transformers with neutrals grounded to station ground.
The problem is with a single phase 13.8kV-208V step down...