Hi everyone: I am sizing a genset to back up a 20 hp (15 kW) 3 phase motor. I understand that the typical way to do this is to multiply the motor rating by 3.5 to find the power needed to start the motor. This results in my having to purchase a 60 kW genset.
I also understand that there are...
Hi everyone:
Does anyone have experience with the GE D25 IED? I am considering this device to provide SCADA monitoring and control at several of our distribution substations.