Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: rbergholz
  • Content: Threads
  • Order by date
  1. rbergholz

    Non-negligent E&O Limitations vs Betterment

    I'm trying to find either case studies or formal language that draws the line between a consulting engineers financial liability for non-negligent errors and omissions, and betterment of the project. Simple case: Say I have a conflicting callout on the plan and profile for a specific...
  2. rbergholz

    How long to you keep project archives??

    We're in the process of cleaning up our old project files and the question came up, "how long to we store these?". We already store many hundreds of boxes offsite. I'm wondering what is the legal requirement for storing project engineering records. I'm looking into the professional...
  3. rbergholz

    Sewer Performance Criteria - Capacity

    Most design standards for new construction of sewer pipelines are somethign like d/D of 0.5 for 15-inch pipe and greater. But I'm interested in performance criteria of sewer pipelines that have been established for a while and perhaps are flowing at peak d/D of 0.85 but not surcharging. Just...
  4. rbergholz

    EQ Basin Shotcrete Liner

    I have a structural engineer claiming that the minimum thickness for shotcrete is 5-inches, which is 2-inches on either side of a 1-inch rebar mesh. The liner doesn't need to carry substantial loads, other than the weight of the water. 5-inches over the entire basin will be very costly. Has...

Part and Inventory Search