Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. MaximumMax001

    cost savings analysis

    I am dealing with a cost savings analysis in a SMT manufacturing plant. We are looking an automated routing system to replace our stand alone router. I did a simple cost savings (labor rate Vs router cost) and my boss asked my to include the dynamic effect of capital over time. He gave me a...

Part and Inventory Search