In a FCC revamp, we are getting a higher bottoms temperature in order to meet LCO spec. and product. To control the bottoms temperature, we are proposing the use of a slipstream of the HCO pumparound flowing in a bottoms quench ring in order to prevent coking. Can anyone indicate experiences...
In a 12 MMSCFD pipeline, some liquid hydrocarbon carry over is now produced (not expected during project), now some possible solutions are trying to be proposed. The whole gas pipeline is within a very isolated area, but a crude line is available. So the initial idea is to recover C5+ and mix...
Have a vessel designed for 10 psig, is horizontal but kind of atmospheric with a free path for venting. Even in a crude service
Does it need ASME stamp?
I understand that ASME stamped is not needed below 15 psig
Thnaks in advance
In a polymer plant, a hopper feeds two different filling systems for packing. A big bag filling system has to be added. The existing two filling system are fed by means of a 2-way valve, being each outlet independently controlled. No major room is available below hopper. Before to recommend a...