When testing the preparation of the sub base preparation for the construction of a new concrete road pavement. Why is the CBR determined and what does it mean?
When a specification calls for a percent compaction eg 95% what would be the effect if you only achieved 90%. In other words how critical is the the asked for figure and what is considered an acceptable variation from that figure (in terms of +/- %)