I belong over in the structural forums, but was hoping I might borrow some insight or at least get pointed in a better direction.
For the last 17 years, I have worked with a ranch in Rural Honduras to help provide basic services to an underserved population. Over the years...
Finishing a job in Miami and am told by the GC that three original signed copies are required of all drawings to submit to the building department.
Since the introduction/acceptance of the wet seal in Nov. 2009, I have produced an original to hold on file at my office (shoring-reshoring...
I work in the fairly specialized field of concrete formwork and shoring.
With the down turn of the economy, a number of projects in my working area have stalled, stopped, had their initial contracts terminated and have come up for subsequent rebid.
On one such project, the structure was 75%...
Hello,
I am looking for information in order to start an application for assistance with a suspended bridge crossing over a river in Honduras, in Central America.
I am hoping to find references or contact information to determine if a suspended bridge is rational for the area in question as...
I was in a discussion with a friend earlier tonight and we disagreed over what is allowable with regard to dowels exposed in a section of SOG that will serve to connect to an additional port of SOG to be poured later - no set timeframe.
I say dowels are acceptble so long as they are not scaly...
Hello,
After updating my computer to an XP system, and updating to AutoCAD 2002 LT, the plot style table I used previously prints out differently than before. The lines are no longer as thin, the minimum width that my machine will now print is twice as wide as it was previously. Setting the pen...