Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: RPizzi
  • Content: Threads
  • Order by date
  1. RPizzi

    Two Steel Plates

    I know this should be be a problem that has been addressed before...but I've looked at numerous books and posts and can't seem to find a solution. I have and opening to be covered by 1-inch thick roadplates. But a single 1-inch plate will be overstressed. We could lay two 1-inch thick plates...
  2. RPizzi

    Timber Pile Grade Beam Connection

    Does anyone have a good connection detail for connecting a 12" wide grade beam directly to a 12" timber pile? A 4' deep grade beam with 2' deep cap gives a depth of 6'. Groundwater depth is 5' below grade and I do not want to form caps in the wet and tremie concrete. Foundation is for multi...

Part and Inventory Search