We are moving into a new building that has a 4" concrete slab. We want to put a 26,000 lb machine in there. The machine sits on 4 legs, equally loaded, so it runs 6,500 lb each. The only thing we have heard is place each leg on a 6" x 6" x 1" steel plate. Do we have to bust...