We are operating a tubular belt conveyor about 400 meters lenght between feed and discharge end. Three weeks ago, we changed the tube (belt). Much problems the first week with the tube turning radially and tripping the sensors. After a break-in preiod the belt was put on line and ran fine...
We are operating a jacketed vessel (carbon steel construction) which operates both exo-thermic during a reaction phase and then the reactor is cooled between batches. The pitting is occurring on the vessel surface. Nitrogen is used to pad the air space during the draining and filling steps...
We are attempting to drive a solid bowl centrifuge (very high wk-2 with normal 7 to 10 minute wind up time when starting accross the ine). Motor is 100 HP. any experience and learnings. We are having trouble with the inverter faulting out due to braking issues.