I have been tasked with developing a
"process and equipment based report on (electrostatic) precipitator for metrics"
Basically, I have to pick some key process parameters of fluidized catalytic cracking and relate thier effect on opacity. Any suggestions?
I have a question about high resistance ground device installation.
Does the device have to be connected to the main bus, or can it be connected to a branch circuit, which in turn, is connected to the main bus?
The application is for a 3Ph., 1500KVA ungrounded delta-delta feeding a 600V bus...
I have a large (over 300ft) section of 16-30" process line with failed mineral insulated electrical heat trace which lasted 20 years before failing (shorting/openiong).
To save money, we obvioulsy want to find out exactly where the shorts/opens are and replace just that section, instead of...
I was wondering if any of you have installed a partial discharge analysis device on any of your motors/generators or switchgear. How well has it worked?
We have a UPS system, and the batteries failed and leaked.
It is outside in a temperature controled shelter unit, protecting it from water and extreme cold.
It has 14 batteries inseries, each about 11 volts.
It has been extremely cold lately.
They are old (over 10 years).
Why-typically-do...
Workers near a 550KV trainsmission line (installing industrial lighting) are experienceing static electricity in the form of discharge. Has anyone seen this before? What is causing it? Can it be mittigaed?
I was working as an electrical engineer for a short time and I was introduced, unpleasantly, to demand load studies and short circuit studies of power distribution systems.
Unfortunatley, I only understood the one-line diagram part of the whole thing. I would like to understand what I was...
You don't know me, but since you are into this green sand thing, I thought I woild ask you.
I am going for a job inerview in Columbia, PA on Thursday, and I have been doign som research in order to prep myself for the interview.
I was searching the internet, and found this statement...
I am going to a job interview on Thursday. The open positions deal with controls in a steel pipe fittings, couplings, and hangars manufacturer.
I have only cursory experience with PLC's (reading about them)
What are the best sources on the web, or what books should I look for in the library...
I am reading an article on copper damascene and CMP.
The article states, "Damascene technology using chemical mechanical polishing is the best way for copper patterning (that part I understand) with a large process window."
I am recently separated from the military (Captain, US Army) and I possess a BSEE and have passed the EIT. I have 6 months work experience in power (low voltage).
I am going to go for a masters (MBA or MSE), but until then, I want to get a job to gain more experience. I have a lot to offer a...
Does anyone know about degree programs in "Engineering Management"?
Are they highly sought after by employers?
Are these programs realatively new?
I am an electrical engineer that is responsible for
grounding a house vacuum system (electrostatic discharge in a pneumatic conveying system). In particular, I need to determine if the hundreds of heat shrinkable polyolefin bands used to couple the tube sections together could be responsible...
I am dealing with a problem of electrical continuity in a pneumatic conveying system. The system has to be continuous and grounged because of electrostatic build up from the fast moving air and particles insid the pipe.
How are these electrical continiuty test performed on pipe-or...