Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. F

    Hi.. I am struggling to solve this hydropower plan

    I have a question, in the micro hydropower planning that I am working on with Q50 = 0.25 m3/s, I plan for the transition channel using 12-inch diameter HDPE pipe, then the mud pocket in the form of an open rectangular tank, then the headrace using 12-inch HDPE pipe, and the headpond in the form...

Part and Inventory Search