What do you consider a reasonable maximum organic content to specify for engineered fill placed under a building foundation? Material in question is a silty clay bordering on a silt. I am expecting 0 to 6 feet of fill under the footings (ie depth varies). 2 story wood frame construction for...
I have a cut/fill site in clay. I need to look at short and long term slope stability. The clays are quite stiff with unconfined values of about 5,000 to 7,000 psf and N=16 to 20. Moisture contents are 16% to 18%.
My short term analysis will use 1,500 psf cohession and 0 friction. The...
I have been asked to complete a mounding analysis to complement scale testing for a planned storm water infiltration system.
Can this be done without a software package?
Any other help to point me in the right direction?
Thank you.
Doug