Hi Everyone-
I'm designing a concrete slab-on-grade for an upcoming project where we will support several pieces of equipment and small (under 20K gallons) tanks with many different support configurations. The project will be active for about a year, at which point we'll demob the equipment...
Hi All-
I have a job in Massachusetts coming up that will likely generate concrete debris that is contaminated with metals. Can anyone lead me to any guidance regarding recycling/reuse, particularly in terms of testing requirements, cleaning requirements, etc.? We are hoping to recycle most...
I am working on a project where the client wants to develop a spring to supply water to bulk distributors and/or bottled water kiosks. I am looking for design standards for bulk water filling stations for tank trucks. I found a company in Canada that sells turnkey systems in a small building...
This question is also posted on the Structural forum.
I am dsigning a concrete slab for two granular activated carbon tanks for water treatment. I am using the method described in "Concrete Floors on Ground" published by PCA. Each tank has four supports with base plates that will be...
I am dsigning a concrete slab for two granular activated carbon tanks for water treatment. I am using the method described in "Concrete Floors on Ground" published by PCA. Each tank has four supports with base plates that will be located near the edge of the slab. My questions are...