Eng-Tips is the largest forum for Engineering Professionals on the Internet.

Members share and learn making Eng-Tips Forums the best source of engineering information on the Internet!

  • Congratulations dmapguru on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Cup909
  • Content: Threads
  • Order by date
  1. C

    Connecting Skids Together

    I work in a manufacturing facility and we're mounting a robot to a semi-moveable skid so it can be moved as needed. The goal being that the robot can be moved & reconfigured to do different tasks as needed without needing to rip up concrete, etc. The skid is pretty straightforward, C channel...
  2. C

    718 Roll Thread Lap Forming

    We're working on a project to roll thread some solution annealed 718 and have run into issues with lap formation. The parts are roll threaded in an infeed setup using a 2-die roller machine (setup picture below.) The dies are 6" long and close in on a 5" machined blank with chamfered ends. After...
  3. C

    Total Runout - Long Shaft

    I'm looking to measure the total runout of a very long shaft along the entire length. A 1" diameter shaft, 5' long, with datums 3" from each end, and a total runout requirement of .005". The traditional method would be to put the datums on Vee-blocks and roll it then drag the dial indicator up...

Part and Inventory Search

Back
Top