  1. pootong

    Weld Roof Panel Tube to Boiler Drum

    Roof panel tube is designed to connect with steam drum by using tube expander without seal weld. Our erection contractor installed two roof tubes (dia 1 1/4") to the drum by using seal weld wihtout our permit. Is there any damage to the drum metal structure? No heat treatment was provided before...
  2. pootong

    NPSHa Margin for Condensate Pump

    Is there any recommendation on NPSH available margin over NPSH required for condensate pump in power plant? Some designer give no margin, what's going to happen when the plant is in operation?
  3. pootong

    Boiler Steel Column Bent/Allowable Value

    Steel structure for boiler column is bent after erection, it can be seen by our eyes. After measurement, it is clear that the column is offset at mid span between bracing points about 15 mm. Distance from one bracing piont to the other is 6,000 mm. It is stated in AISC that allowable off set is...
  4. pootong

    Fire Protection Equipment Pressure Rating

    Our fire water system pressure is 17 Bar.g, we have some problems of selecting fire protection equipment such as deluge valve, fire hose etc. Let say fire hose, it is stated in technical data that maximum working pressure is 12 Bar.g but burst pressure is more than 30 Bar.g. The question is can...
  5. pootong

    High/Low Voltage Motor

    Our power plant specification normally stated that motor 200 kW and larger shall be medium or high voltage type. We always have problems with the contractor when it comes to the decision whether medium voltage motor should be used when motor output is slightly higher than 200 kW (let say 220 kW...
  6. pootong

    Boiler Hydrotest Water Quality

    Our boiler is 70 Bar.g/480 C 90 T/hr steam production is going to get hydrotest very soon but demin water plant is not yet ready for water production. Is it possible to use potable water (municilpal water)for hydrotest. Any recommendation is welcome.
  7. pootong

    BS 4504 flange

    How to get a flange with nominal size of 1500 mm BS 4504 PN16 ? The standard lists only 1400 and 1600 size.
  8. pootong

    Chilled water energy metering system

    Dear All I want to sell chilled water to our customer, we will use energy metering system to measure energy absorbed by our customer. Can anybody recommend the type and accuracy of this metering system? Our chilled water flow rate is 4,500 m3/hr? This is to transfer cooling load of 12,500...
  9. pootong

    Chilled water leakage and make up cost for water

    Dear All We are planing for sell chilled water to our customer in the concession area. I wonder if we lost chilled water in custumer system, how can we charge them in terms of water and energy loss. Regards Pootong
  10. pootong

    Drum sizing estimation

    Dear All Can anyone suggest me how to estimate the size of boiler steam drum? Is there any rule of thumb or sizing guideline? Regards Pootong
  11. pootong

    Condenser predicted pressure drop

    Dear All I got a outline and detail arrangement of the condenser to be installed in one of our biomass power plant. Please let me know if anyone can suggest me how to estimate the pressure drop accoss condenser. The following data is available now. 1. Condenser tube diamter, length and...
  12. pootong

    Screw pump to API676

    Dear All This is my first time posting my question on this Eng-Tips, I got screw pumps installed in our new power plant. I would like to know how to make an performance acceptance test. According to API676 there is no detail criteria for this. For example; pump head, flow rate, efficiency and...