Hey Everyone,
I was having trouble trying to understand that why would some Engineers use Channel with suspended ceiling while some directly attach the hanging wire to slab. As shown in picture hanging wire are attached to channel section instead to floor. In some cases hanging wire are...
Hey Everyone,
I was having trouble trying to understand that why would some vendors use C section with suspended ceiling while some directly attach the hanging wire to slab.
Thanks
Hey Engineers,
I want to ask you guys about overlapping zone for top and bottom reinforcement of Grade beam. The beam length is 4.4m. The beam is surrounded by Pilecap from both side and secondary beam from center. Where should be overlapping zone for the top and bottom reinforcement.
Hey Everyone,
So basically, I dont know the right terminology ,but I came across this grade beam enlargement or increment. I wanna know what is happening here and why are we doing the same. Thanks in advance for taking the efforts to answer the question.