It seems that all slab on grade designs methods are traditionally based on forklifts. Is there any methdo to designing for a plain load per area.
Also, how do I check a newly placed (10 days old) slab on grade for a crane load. The crane is neede to erect a buildign over the new slab.
Thanks
JW