I'm a entry level BLDG Inspector in a small town, A local contractor has gusseted some flat trusses with 7/16" OSB that were damaged in a fire, basically he jacked them up to get rid of the 4 inches of negative camber and sandwiched them with OSB the entire length of the span, Is this too...