i am currently designing a dg plant utilizing 6 2500kva generators at 15kv. this plant will parallel with the grid at a municipal electric incoming sub. the sub is 15mva 69kv to 5kv. the muni proposes to upgrade the muni feeder to 15kv in the near future and cut the 69kv feed. i am proposing...