  1. Eng_Struct

    Rail Offset On Crane Runway Girders

    Hi Group, For one of my project, the contractor did not install the crane runway girders within the tolerence. The rails for crane are now at roughly 5/8" (15.9mm) offset from the centre of the web of the runway girder. Runway girder is wide flange beam with cap channel and has the web...
  2. Eng_Struct

    Foundation Requirement for 40m High & 2.5m diameter stack

    Hi Group, I am looking for foundation design guidance for a 40m tall and 2.5m in diameter stack for an industrial building. The native soil is 3m below the finished grade and will mos likely require a deep foundation solution. What are the design considerations i.e., seismic and wind lateral...
  3. Eng_Struct

    Bent Anchor Bolts With Column & Framing Installed

    Hi Group, For one of our project, contractor had installed the column and framing on levelling plate and nut with column bases ungrouted. Before the GC had a chance to go and grout all column bases, the steel contractor used cables for temporary supports that were tied to column base at a few...
  4. Eng_Struct

    Column Base Plate Anchor Bolts

    Hi Group, I had a column with a 10"x10"x1/2" base plate with 2-3/4" sitting on 1.5" grout for a project. The contractor somehow did not get the top of footing and anchor bolt location correct. The underside of the baseplate is 3.5" from top of pier. They ended up slotting existing holes to fit...
  5. Eng_Struct

    Back-to-Back Channel Attached to OWSJ Bottom CHord

    Hi Group, I need to specify connection between back-to-back channels to the bottom chord of the joist. The channels are there to support pipe hangers. The total load at each end of the channel will be 1500 lb. I am envisioning a connection similar to the one below. Instead of full length rod...
  6. Eng_Struct

    Resisting Torsion Due to Guy Wire Anchor Attached To Roof Framing

    Hi Group, I need to provide guy wire anchors to support the mechanical duct for wind uplift. The wires will be installed at roughly 45-60 degree angle and the guy wire anchor will consist of a round HSS tube with eye-bolt and base plate that will be welded to the roof beam top flange. There...
  7. Eng_Struct

    Checkered Plate On Metal Deck in Penthouse Floor

    Hi Group, The client wants to use a metal deck with checkered plate in a penthouse floor. Note that the metal deck is the primiary structural element supporting the selfweight of the floor and and other live loads - the checkered plate on top will be only 1/4" thick plate with epoxy finish to...
  8. Eng_Struct

    Pile Cap Design For Helical Piles

    Hi Group, I am seeking some guidance on designing a concrete pile cap for a foundation supported by helical piles. I am adding a new column inside an existing building to allow roof framing modification for new roof openings. The column is interior and will not be resisting any lateral load...
  9. Eng_Struct

    Strenghtening Existing Spread Footing

    Hi Group, I have a 2.7m x 2.7m wide-spread footing with a 0.6x0.6 pier. The client is adding a rooftop unit that results in bearing pressure greater than the allowable based on the record drawing. In the past, I have underpinned the existing footing by pouring a larger pad below the existing...
  10. Eng_Struct

    Adding Steel Beam Below Exist. Conc. Beam

    Hi All, I have an existing concrete floor beam that is designed for a certain floor live load. However, the client is installing a piece of equipment that will result in an area load larger than the design floor load. There is no information available on the reinforcing of the beam. I am...
  11. Eng_Struct

    Restoring Cut Reinforcement in Column

    Hi Group, Contractor working on one of our project has cut through the foundation wall at the corner. The corner is detailed as a column as it supports loading from two levels above. Any suggestions how to reinstate the capacity? I was thinking of thickening the corner on the inside or...
  12. Eng_Struct

    Rust Stains on Exterior Galvanized Steel Framing

    Hi Group, Please refer to the image below. The photo is from an exterior stair framing from a low to a high roof. All framing members were originally galvanized. We have observed rust stains primarily at the joint locations and for the life of me, I am not able to figure out why galvanized...
  13. Eng_Struct

    Cracked HSS Post

    Hi Group, Point 1: I have a 10" x 10" x 5/8" HSS stub post for an equipment platform that has a crack running in the vertical direction along one of the corners. The post also has some bulging on the sides. The post is adequately designed for the loads. However, I am unclear what may have...
  14. Eng_Struct

    New Opening in Existing Slab

    Hi Group, I have an existing slab-on-beam system that requires new MEP openings through the floor slab. We are looking at 6 - 5" dia openings in one row. The slab layout and opening location are shown in the image attached. I have created a FE model and have the localized bending moment and...
  15. Eng_Struct

    Metal Deck Attached to Wood Nailers

    Hi Group, I am replacing an existing wood deck with a metal deck for one of the projects. The existing roof system consists of OWSJ with 2x6 wood nailer attached to the joists using 5/16" dia. x 6" bolts at 2' and 2" wood deck attached to the nailer. My question is can I simply take out the...
  16. Eng_Struct

    Soild Double Layer Brick Wall Design Guide

    Hi All, I have an existing load-bearing 8" thick double-layer solid brick wall similar to the one circled in the image below. I want to put a new beam supported on top of the wall with an end reaction of roughly 180kN. I want to check the axial ( & bending due to eccentricity) capacity of the...
  17. Eng_Struct

    Column on Double Layer Brick Wall

    Hi All, I just wanted to get some opinions /ideas on how to best support new penthouse roof column on top of an existing double-layer brick wall. The wall is currently supporting roof joists and the new columns fall direction above the joists spacing based on architectural layout. I am thinking...
  18. Eng_Struct

    Supporting New Penthouse Column on Existing Roof Joists

    Hi All, For one of my projects, I am adding a new penthouse on top of the existing roof. The new penthouse columns can only be arranged such that they fall directly above the existing roof joists. Connection detail to support the column on the joists is not something I have seen before...
  19. Eng_Struct

    Additional Fasteners on Existing Metal Deck

    I need to provide additional metal deck fasteners along a perimeter wall (30m)to provide adequate diaphragm shear capacity. The existing deck is composite steel metal deck with concrete topping. Chipping the concrete to expose deck is going to be a lot of work. I am wondering if the deck...
  20. Eng_Struct

    New Building Expansion Foundation Next to Existing 1993 & 2006 Footings

    Hi Group, I am considering extending existing column spread footing for a new column as part of the expansion. As shown in the sketch the existing spread footings are within 10ft of each other but are at complete different founding elevation. The original construction drawings require bearing...