Hi,
I'm working on a bullwheel capstan system for underground cable pulling.
Can someone give input on whether I'm approaching the loads on the shafts correctly?
From capstan calcs (mainly US Navy wire rope handbook) I'm aiming for 100,000 lbf on final wrap and should be able to achieve it...