I'm looking for a little guidance:
I want to create a generic retaining wall schedule that I can use for smaller projects in the SF bay area up to 8'-0" or so. Worst case assume Clay, sandy clay, silt and sandy silt, SDC E, Site class D:
Bearing 1500 PSF
Passive 100 PCF
Active ????
Seismic...