Good day experts
I am doing a foundation underpinning at my house with overpour method. The issue I am facing is that overpoured concrete only goes half way under the 16 inches wide footing leaving a 1.5-2 inch gap at the rear part between new slab and the footing.
I use proper vibrator and...
Hello folks. I am not a structural engineer hence seeking an advice from experienced folks out there.
I have an L-shaped concrete retaining wall comprised of two cold joined pieces with large footing. I would like to attach a new perpendicular wall to it which will serve two goals:
1. joining...