Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations JAE on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: EMWWW
  • Content: Threads
  • Order by date
  1. EMWWW

    Canopy over Electrical Control Panels in a Wastewater Treatment Facility

    Would a Canopy over Electrical Panels in a WWT Facility qualify for a Risk Category III (The Risk Category assigned to all structures, Seismic Design Category C, Site Class E).
  2. EMWWW

    Clarifier Retrofit

    We are working on retrofitting a Clarifier with new Internal Mechanisms. The Project is located in California. The Clarifier itself was built to an earlier Code and Seismic requirements (2016). What are the compliance requirements for such a retrofit, and how can the design reconcile the...
  3. EMWWW

    Justification for not using loads per 15.7 for retrofitting existing clarifier with new internals

    Hi, Can anyone tell me the grounds under which the engineer would take exception to verification of loads per 15.7 (ASCE 7.16). These are for calculations for a clarifier internals replacement project. Thanks, LK

Part and Inventory Search

Back
Top