Hello
We have a portable wood container building with metal cladding placed approx 30 meters away from the Dike of the Hydrocarbon tank. This is potential for Pool Fire.
The building is exposed to 37.5 KW/M2 and 20kw/m2 as per the QRA report.
There will be 200 people occupying this building...
Hi,
We have a portable wood container building with metal cladding placed approx 30 meters away from the Dike of the Hydrocarbon tank. This is potential for Pool Fire.
The building is exposed to 37.5 KW/M2 and 20kw/m2 as per the QRA report.
There will be 200 people occupying this building...
Hello Friends,
We have Ethylene Oxide EO toxic gas detectors (GDT)in side plant. These is deluge activation linked to these EO Toxic gas detectors. Once these gas detectors 10 ppm (2 time of STEL) value it will activate Deluge system.
EO detectors have inherent cross sensitivity issue and we...
Just a usual question to friends here.
What are the important process safety factors to look into while we are going for process/petrochemical plant capacity increase or DBN.
One first though will PSV sizing and release capacity.
Does it require adequacy check on fire fighting system also with...
If the pump discharge is 12 barg , line size 2"and if we connect 12 barg gasoline to 0.5 barg vessel(Big volume 700 M3)does it require pressure reduction a Pressure controller. or it is okay of discharge 12 barg to this low pressure vessel?