Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Hamza Abu-Jajeh

    Dynamic reaction of water on the building during the earthquick

    Hi all, I have a project under construction with an infinity pool at level 50 around 218 m above ground, I am wondering about the consideration of water dynamic reaction during the earthquake how it could be considered in the design? and if it required to be considered? I have seen some video...
  2. Hamza Abu-Jajeh

    contiuity of additional rebars

    Hi All, i am wondering that dose additional rebars required continuity ? assuming that an additional bars required for a length more than the available length at site then dose the overlapping required or it can be placed without overlap, i have a similar case that at constriction joint location...

Part and Inventory Search

Back
Top