  1. Osm.abdo

    Pipeline Back pressure issue

    Hi All we have 12” pipeline , 44km long at 75c exporting temp the initial production is 10000 BOPD, (70m3/hr). now the production decline to 2000 BOPD which has raised flow assurance risks in view of the low flow (pipeline minimum flow rate) which associated with the crude gelling (pp =36c) ...