Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations Ron247 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: xiake
  • Content: Threads
  • Order by date
  1. xiake

    reduction factor for power cable laid vertically in ladder

    hello, In wind power generator, power cables are laid vertically along ladder from ground to nacelle of above 100 meters height. The cables are installed in method F according to IEC 60364-5-52(single-core cables with three loaded conductors in trefoil),The clearance between trefoil groups are...

Part and Inventory Search