Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: m.scofield
  • Content: Threads
  • Order by date
  1. m.scofield

    socketed drilled shaft permanent casing

    IBC 1810.3.9.6 indicates: "Socketed drilled shafts shall have a permanent pipe or tube casing that extends down to bedrock and an uncased socket drilled into bedrock, both filled with concrete." Any ideas why IBC requires permanent casing vs. temporary casing?

Part and Inventory Search

Back
Top