Hello,
In our project we have a concrete fire tank which is lower in level than the fire pump room by 590 mm, taking in consideration the level at which the suction pipe will be fixed in the tank that means it will exceed 1000 mm from suction to bottom of tank.
Is this acceptable or it will...