I am currently building a distribution center (250,000 sq/ft) with 28' min clearance @ eve, with ESFR heads approx 2500 heads and a pump on the system as well. The owner is pressing me (CM /GC) to find a way to NOT have to apply 1 hour fire proofing on the columns and structural connections...