Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: CTXG
  • Content: Threads
  • Order by date
  1. CTXG

    Treatment process of tailings pond water

    Hi all, This is a very generic question. What are the treatment processes for a tailings pond water to achieve the target effluent quality. What are the considerations? What is the typical process train? Does it include RO? What is the typical recovery and flux of RO, if it does? Sorry have...
  2. CTXG

    Does a change in flow lead to an instantaneous flow downstream?

    Hi, I have a pump with VFD, followed by pipelines downstream to point A. For example, the pipeline to point A is around 100m. If I increase the flow by changing the pump setpoint, does downstream pipeline register an increase instantaneously? Or is there a time lag? Thank you in advance.

Part and Inventory Search