Hi,
I'm new to this great forum and posted for the first time.
I'm a geotech engineer working in a team that is involved in a 4-level basement design for a proposed building in an urban setting.
The ground profile consists of 2-3 metres of residual soil and then 6-9 metres of weak weathered...