    heat treat facility

    working on project existing heat treat facility, existing oil quenching protected by co2 system. the remainder of plant has 9 furnaces. my question is my design of .30.3250 with 500 outside hose. entire facility will be dry systems. there may be some areas that could be reduced such as...
  2. CEJM

    nfpa small arms fire protection requirements

    i have a project that owner will be storing ammunition on pallets on the floor there looking to store 60,000 to 80,000 pounds of ammo. I have read thru nfpa 495 but do not see any mention of density would oh group 2 be statisfactory?