Folks,
I've been asked to check the PSV sizing for a temporary chemical injection skid our company has proposed. It's been a while since I've looked at pump sizing and there is one thing bothering me.
The setup is a Checkpoint 1500, 1" plunger pump injecting 25L/h into a system operating at...