I am working on a project which consists of fixed cone roof newly built API 650 tanks, passed the hydro test requires some welding to be performed.
In the current condition, As per Fig.5.3a roof-plate joint, lap joints of roof are externally fillet welded...
Hi Friends,
Iam working on a project which consists of fixed cone roof newly built API 650 tanks, passed the hydro test requires some welding to be performed.
In the current condition, As per Fig.5.3a (roof-plate joint), lap joints of roof are externally fillet welded. Our design considered...