  1. Ahmed Abdallah

    Claim for Design Error

    MEP Contractor Noticed a serious Design Error in Pump Head which it is almost 150% of the Design pump Head ; Consultant agreed the contractor calculations and revised selection . Contractor raised a claim for the additional Cost to avoid the design Error but the Client cost Engineer referred to...
  2. Ahmed Abdallah

    support sprinkler pipes from secondary steel structure

    I have a situation where the sprinkler pipes are 9 meter away from Steel beams ;consultant advised to install the sprinkler main piping attached to the beam and sprinklers drops will be 9 meters . our proposal to provide low level secondary steel structure to enable us to support the fire piping...