Hi, I need help with bolt preload design.
It's a simple problem, but I don't have experience with this argument.
I've two plates joined with two M5,
plates are s235 fy=235MPa steel thk 3mm and 2mm, bolt 8.8 fy=600Mpa.
The design preload of the bolt is 6300 N, evaluated with meccanical property...