Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Crusader36
  • Content: Threads
  • Order by date
  1. Crusader36

    Inspection Chamber at every Joint

    Dear techies, I have attached a pic of commercial sewer drainage line. Here the designer put Inspection chambers at every joint or junction. He put chambers at even 1.5mts distance which is just weird. I don't think this as proper way. If we keep adding IC at every joint and junction the whole...
  2. Crusader36

    Manhole VS Floor Clean out

    Dear friends, i was looking to clarify the difference between FCO and Manhole. I have done some study and read threads here but info is contradicting. 1.Look into the file attached where ground floor sewer line is depicted which utilises manhole at every point. I have been designing such models...
  3. Crusader36

    Sewer line through Basement

    Dear Engineers, I have an issue to discuss. A customer approached me yesterday to get an engineering help regarding his problem. His building consists of basement and three floors above it. Previously I suggested him to have a pump at the basement to pump up the three toilets waste to ground...

Part and Inventory Search