Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: dcvo89
  • Content: Threads
  • Order by date
  1. dcvo89

    Development Length

    Hi, Let's say you have a concrete beam that hangs off the side of a concrete column. For the rebars that extend from the beam and into the column, I need to calculate the development length. Based on the equation for development length (ACI 318-14 Chapter 25: Section 24.4.2.3), there are...
  2. dcvo89

    ASCE 7-10: 12.3.3.4 - 25% Increase of Diaphragm Connection to Vert Elements/Collectors

    Per ASCE 7-10 Sect 12.3.3.4 for horizontal irregularity type 4 (offset shear wall from floor to floor), there is a 25% increase in the connection of the diaphragm to the vertical element/collector. I'm looking at this SKGosh article, and it says that you increase the force by 25% for the...

Part and Inventory Search