Hey is that usual that i got a brace axial force ouput from SAP2000 equals to 600ish kips?, im designing a 10 stories building using a chevron braced frame configuration, end of the braced assumed to be pin-pin, the base shear is 2500ish kips. with an axial force like that, the beam and column...