  1. mandmm

    Dear Sir As per NACE MR 0175/ ISO 1

    Dear Sir As per NACE MR 0175/ ISO 15156-2 CLAUSE 7.4 Is it required to carry hardness test for the material if plate cut by using gas cutting machine as per NACE requirement?
  2. mandmm

    Consumable Impact test requirement

    Dear Sir, 1) Is it required carry impact test (prior to production )for the consumables while we are using WPS with impact tested ? If it is yes, what temperature we need to conduct and who is responsible to carry out?
  3. mandmm

    NACE Hardness

    Is it required to carry hardness test for the material cut by using gas cutting as per NACE requirement?
  4. mandmm

    RT inside boiler

    Hi all, is their any restriction to conduct RT inside the boiler as per ASME sec I ? if it is yes please provide the reference.
  5. mandmm

    B31.3 and ASME Section IX QW 403.6 impact test requirement

    Dear All, a) I need to prepare WPS for the range 3 to 20 mm as per B 31.3.can you please let me know what are the PQR coupons required?with impact. b)As i know As per B 31.3 Table 323.3.1 A 5 says:Impact test requirement thickness qualification: T/2 to T+6 mm for the Thickness T. I e i need to...