Hello all - I'm a test engineer, and one of the tests my technicians perform is a proof test on a 42 cubic inch container, at 9000 psi. The catch is that one of the requirements of this test is the container cannot be filled or vented at a rate faster than 1000 psi/min (or 2000 psi/min for a 3...