Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Tinble
  • Content: Threads
  • Order by date
  1. Tinble

    Electrical bonding across pipeline flanges

    Hi All, Is it required to provide electrical continuity across flanges separated by spiral wound gasket(graphite fill)? Pipe service fluid is Gasoil. Thanks in advance
  2. Tinble

    MMSCFD to m3/hr

    Hi all, CAn anybody help in the below issue? how to convert MMSCFD to m3/hr (gas)? Is it possible to directly convert ft3/day to m3/hr for million quantity? i.e, 1MMSCFD=1179.868m3/hr? Is it correct?
  3. Tinble

    Flow Velocity In Pipelines

    Hi All, Could anybody help to advise about the recommended maximum gas(natural gas) flow velocity in a pipe line?
  4. Tinble

    Psv Application For Interconnected Pressure Vessel

    Hi all, Please share your ideas about how to introduce Relief devices for interconnected vessel.Is it required to install separate PSV for each vessel? Any supporting standards(code) for this case? Please refer the process given below Service-Natural gas,4-6 barg, 15-55 deg C Vessel package...

Part and Inventory Search