A client wants to build a new works on a disused landfill. There will be a number of 11/0.415KV substations on site.
FYI - there will be a 1-2m aggregate capping layer and hardstanding.
Does anyone have any experience of how to approach the earthing in such a situation?
We have a requirement to soft start a 800kw pump, the ramp time is expected to be around 30secs.
Our consultant tells me the soft starts will be 'block fired'.
I (partially) remember we had some furnaces which were thyristor controlled and there were issues with harmonics and high earth and...
For the UK . .
I work for a large utility in the Sth of England.
We have a DNO substation located in a compound on our site, this is a sole supply - we are the only consumer on this transformer. The DNO provides us with a 500KVA supply at 415VAC, the LV tails are 25m long and terminate into...
In olden times mercury was used in rectifiers.
Why was mercury used and how did these rectifiers operate ie was there an ionised gas with a grid voltage between anode and cathode?
I need to work out the DC power input to a inverter to supply a 3 phase output of 35KVA at 415V (I'm English) at power factor of 0.8, the inverter effiency is 90%.
DC input: 420V.
I've had a go at doing the calc but am unsure whether to apply the root 3 factor to the ouput.
I want to know if I can joint an old 11kV cable that's 50yrs old? The cable is an armoured with a 150mm csa, about 0.5 mile long and goes under a stream. It also passes through ground that has injected sewage sludge in it, which I'm told can deteriorate the physical integrity, so . . .
i) What...
How can I find out the average conductor temperature of a cable, if I know the th external temp of the cable, the ambient temp/humidity and the cable type/construction?
I have got some 4 core (TP&N) XLPE SWA cu conductor cables in the range 35-300mm, which are quite warm to the touch.