Hello all,
During the first inspection campaign of a ten-year old MDEA Absorber, cracking was found by PT at 5 out of 12 longitudinal seam welds of the top head 316L (NACE)cladding. Nothing abnormal in the construction MDB documentation. The vessel has been running for 10 months after the...