I work for a firm that primarily does sanitary sewer rehab studies. In our most recent project, the contractor put in a temporary stream crossing that consisted of a CR-6 (crusher run) culvert and corrugated metal pipe, as per the Maryland Sediment and Erosion Control Design Manual. To make a...